Concrete Testing Using Geotechnical Software


Concrete testing includes a variety of methods for testing concrete moisture, including both surface areas and the concrete within the depths of the slab. One commonly used method, though not covered in ICRI certification, is moisture meters which can be used for finding areas of higher surface moisture. This method, however, should not be used to obtain a quantitative value of the moisture or to indicate whether a slab is dry enough to start covering the floor, but mainly to show you where to begin. Once you've gotten a good reading, your geotechnical software can transmit the data directly through the lab, using a combination of mobile and online technology.

There are generally three moisture tests for concrete testing covered in ICRI certification. These include the calcium chloride test for moisture vapor emission rate of a slab, the surface relative humidity test, and the slab internal relative humidity test. It's essential that the building's environment remain consistent at least 48 hours prior to testing to allow the slab to reach a stable equilibrium with the ambient conditions of the building. The ideal temperature is right around what the plant emits during regular operation. This way the geotechnical software is fed more reliable data that can be transmitted back to the lab.

In concrete testing, the calcium chloride test measures the MVER of a slab, which essentially is the amount of H2O vapor emitting from the surface of the concrete. It's a popular test to determine if a floor is ready for floor coverings. Quite a few companies measure kits for this service, but it's best to use a testing kit that's compatible with geotechnical software so the data can be transferred instantly to the lab over the Internet. Unless of course, you'd like to relive 1985 and hit the payphone after lunchtime lugging a pocket full of quarters.

Each calcium chloride test is conducted using a small dish of dry bone calcium chloride that is then placed under a plastic dome to create a closed environment over the concrete. This is left on the surface for 60 to 72 hours. The CaCl then absorbs all moisture emitted from the concrete for accurate measurement. The MVER value can be expressed in the amount of water coming from the surface of 1000 square feet of area in 24 hours.

Once you've gotten accurate concrete testing data, the information is automatically cataloged by your geotechnical software and transferred electronically back to the lab. The concrete testing itself may be similar, but the transfer of data couldn't be simpler.




Saul Ellrod is the author of this article on geotechnical software and the process of concrete testing.





This post was made using the Auto Blogging Software from WebMagnates.org This line will not appear when posts are made after activating the software to full version.

2012年8月28日 星期二

8 Steps to Measure the Relative Humidity in Concrete According to the ASTM Standard


Practical advice for measuring humidity

The most common source of error when measuring relative humidity is a difference between the temperature of the probe and the temperature of the environment. At a humidity condition of 50 % RH, a temperature difference of 1 °C (1.8 °F) typically results in an error of 3 % RH on relative humidity.

It is good practice to monitor the display of the moisture meter for temperature stability. The probe should be given sufficient time to come to equilibrium with the environment to be measured. The larger the initial temperature difference between the probe and the environment, the more time is required for temperature equilibrium.

In extreme situations, condensation may occur on the sensors when the probe is colder than the environment. As long as the humidity / temperature limits of the humidity sensor are not exceeded, condensation does not alter the calibration of the sensor. However, the sensor has to dry out before it can provide a valid measurement.



Step 1: Check the correct functionality of the instrument and probe using the humidity standard tube.

Step 2: Concrete floor slab and air space surroundings must be at service temperature / humidity for at least 48 hours.

Step 3: Define numbers of test holes

Step 4: Define depth of test holes

Step 5: Drill and prepare test holes

Step 6: Wait 72 hours for moisture equilibrium

Step 7: Measure

o Insert in-situ probe into sleeve

o Wait for temperature equilibrium

o Check for stable values



Step 8: Report all necessary information




To find out more about Proceq's moisture meter visit us at http://www.proceq.com/en/non-destructive-test-equipment/concrete-testing/moisture-corrosion-analysis/hygropin.html?pqr=2
Proceq SA of Switzerland, founded in 1954, is the leading manufacturer of high quality portable test equipment for concrete properties, metal hardness and paper hardness applications. The company's strong research and development team continues to create products that set industry standards for portable test equipment.
The moisture meter Hygropin offers the perfect solution to identify and monitor moisture in concrete. Due to its small, fast sensor, diagnosing moisture according to the ASTM standard is quicker and easier than ever before.





This post was made using the Auto Blogging Software from WebMagnates.org This line will not appear when posts are made after activating the software to full version.

2012年6月5日 星期二

8 Steps to Measure the Relative Humidity in Concrete According to the ASTM Standard


Practical advice for measuring humidity

The most common source of error when measuring relative humidity is a difference between the temperature of the probe and the temperature of the environment. At a humidity condition of 50 % RH, a temperature difference of 1 °C (1.8 °F) typically results in an error of 3 % RH on relative humidity.

It is good practice to monitor the display of the moisture meter for temperature stability. The probe should be given sufficient time to come to equilibrium with the environment to be measured. The larger the initial temperature difference between the probe and the environment, the more time is required for temperature equilibrium.

In extreme situations, condensation may occur on the sensors when the probe is colder than the environment. As long as the humidity / temperature limits of the humidity sensor are not exceeded, condensation does not alter the calibration of the sensor. However, the sensor has to dry out before it can provide a valid measurement.



Step 1: Check the correct functionality of the instrument and probe using the humidity standard tube.

Step 2: Concrete floor slab and air space surroundings must be at service temperature / humidity for at least 48 hours.

Step 3: Define numbers of test holes

Step 4: Define depth of test holes

Step 5: Drill and prepare test holes

Step 6: Wait 72 hours for moisture equilibrium

Step 7: Measure

o Insert in-situ probe into sleeve

o Wait for temperature equilibrium

o Check for stable values



Step 8: Report all necessary information




To find out more about Proceq's moisture meter visit us at http://www.proceq.com/en/non-destructive-test-equipment/concrete-testing/moisture-corrosion-analysis/hygropin.html?pqr=2
Proceq SA of Switzerland, founded in 1954, is the leading manufacturer of high quality portable test equipment for concrete properties, metal hardness and paper hardness applications. The company's strong research and development team continues to create products that set industry standards for portable test equipment.
The moisture meter Hygropin offers the perfect solution to identify and monitor moisture in concrete. Due to its small, fast sensor, diagnosing moisture according to the ASTM standard is quicker and easier than ever before.





This post was made using the Auto Blogging Software from WebMagnates.org This line will not appear when posts are made after activating the software to full version.

2012年5月27日 星期日

Concrete Testing Using Geotechnical Software


Concrete testing includes a variety of methods for testing concrete moisture, including both surface areas and the concrete within the depths of the slab. One commonly used method, though not covered in ICRI certification, is moisture meters which can be used for finding areas of higher surface moisture. This method, however, should not be used to obtain a quantitative value of the moisture or to indicate whether a slab is dry enough to start covering the floor, but mainly to show you where to begin. Once you've gotten a good reading, your geotechnical software can transmit the data directly through the lab, using a combination of mobile and online technology.

There are generally three moisture tests for concrete testing covered in ICRI certification. These include the calcium chloride test for moisture vapor emission rate of a slab, the surface relative humidity test, and the slab internal relative humidity test. It's essential that the building's environment remain consistent at least 48 hours prior to testing to allow the slab to reach a stable equilibrium with the ambient conditions of the building. The ideal temperature is right around what the plant emits during regular operation. This way the geotechnical software is fed more reliable data that can be transmitted back to the lab.

In concrete testing, the calcium chloride test measures the MVER of a slab, which essentially is the amount of H2O vapor emitting from the surface of the concrete. It's a popular test to determine if a floor is ready for floor coverings. Quite a few companies measure kits for this service, but it's best to use a testing kit that's compatible with geotechnical software so the data can be transferred instantly to the lab over the Internet. Unless of course, you'd like to relive 1985 and hit the payphone after lunchtime lugging a pocket full of quarters.

Each calcium chloride test is conducted using a small dish of dry bone calcium chloride that is then placed under a plastic dome to create a closed environment over the concrete. This is left on the surface for 60 to 72 hours. The CaCl then absorbs all moisture emitted from the concrete for accurate measurement. The MVER value can be expressed in the amount of water coming from the surface of 1000 square feet of area in 24 hours.

Once you've gotten accurate concrete testing data, the information is automatically cataloged by your geotechnical software and transferred electronically back to the lab. The concrete testing itself may be similar, but the transfer of data couldn't be simpler.




Saul Ellrod is the author of this article on geotechnical software and the process of concrete testing.





This post was made using the Auto Blogging Software from WebMagnates.org This line will not appear when posts are made after activating the software to full version.

2012年3月9日 星期五

Installing Hardwood Flooring Over Concrete and Wood Sub Floors


Expansion & Contraction of Hardwood Flooring

"The flooring shop said to leave 10mm for solid wood floor expansion at the walls...now the boards are lifting off the floor." Ill informed advice like this often leads to floor problems. Many flooring sales people unfamiliar with solid wood flooring assume expansion is the same as laminate flooring. In reality that 10mm is not enough for solid wood flooring.

What Is An Expansion Area? Why Do We Need It?

Expansion areas are spaces left around the perimeter of rooms, against fixed objects such as columns, thresholds, hearths, skirting boards, and other stationary items built or secured into the framing structure of the home. Even though Hardwood flooring used is no longer living and breathing it still reacts to moisture changes in the environment. The cells in the solid wood will take on or absorb moisture when the relative humidity is high, or when exposed to water. Expansion takes place, and the hardwood grows, for lack of a clearer term, across the grain (width) of the plank (see below, not all will react this way). Conversely when air moisture levels decrease, moisture content evaporates, shrinking of the solid wood will occur.

When we say spaces, they are defined as installing the hardwood flooring up to and away from the fixed objects. For example; "we recommend at least 15mm small to medium area-18mm expansion on larger areas at the skirting board or wall if new skirting to be fitted."

Hardwood flooring can react to the presence of moisture. In the dry winter heating months, moisture can leave the wood flooring causing the floor to contract slightly in size, which can leave slight gaps between each floor board. In the summer months when the humidity is higher, the hardwood flooring will expand and the gaps will disappear. If there is too much moisture in the subfloor it will cause the wood planks to cup, or buckle. Nearly all problems related to hardwood flooring are due to improper installation and sub floor preparation. This is why it is important when installing hardwood flooring that you follow the correct recommended installation methods by the manufacturer.

Direct Glue Installations

A direct glue installation requires the use of a flooring adhesive applied directly onto the subfloor (never directly apply to the boards). This method can be used on concrete and wooden subfloors. When done correctly this is the most stable method for fitting solid wood flooring as the elastic flooring adhesive allows the floor to expand and contract with no problems.

If you are laying over a concrete subfloor you will first need checked the concrete moisture, if the floor has a moisture content of over 4% then either wait until the sub floor dries to meet this level or use an appropriate moisture barrier, we recommend Sika Mb Primer to ensure no damp rises up into your new floor.

Also note that new concrete slabs require a minimum of 60 days drying time before covering them with a wood floor.

All Concrete sub-floors must be dry, smooth, level and free of structural defects. If the concrete sub floor is uneven we recommend using sika latex self leveling compound to level the subfloor. The concrete must also be free of contaminants i.e. paint, oil, wax grease, dirt and curing compounds (the reason for this is that you need the self leveling compound to bond to the sub floor).These may be removed chemically or mechanically as your local hardware store and they will sell you the correct floor cleaner, but do not use solvent-based strippers under any circumstances. The use of residual solvents can create problems with the bonding of flooring adhesives. It is important to ensure a proper bond between the adhesives and concrete and wood panels.

If you have a wooden subfloor you will need to lay a plywood base over the existing floor boards (we recommend using 4mm -6mm exterior grade plywood and screw down every 15cm along the edges and at 20cm intervals throughout the rest of the board using the 1 inch deck screws) before installation, this will then give you a smooth and level surface for you to install you hardwood flooring onto.

You will need to leave a 15mm expansion gap around the perimeter of the room for large areas over 6 meters in length we recommend 18mm expansion gap. To maintain this gap during installation spacers are provided in the kits. After you have installed the hardwood floor you can cover this expansion gap with scotia or new skirting boards The 15mm expansion gap also needs to be left in doorways where the hardwood floor follows through from one room to another we sell on this website a full range of door profiles available to match your floor.

Nailed Down Installations

Nailed down installation is the traditional way to install hardwood floors and can be done either directly onto wooden subfloor or on a concrete subfloor with the use of battens. When fixing battens onto concrete you will need a power-actuated nailer to drive through the battens and fix directly into the concrete, firstly lay out polyethylene moisture sheet then plywood over the battens to create a new sub floor. We recommend 12mm exterior grade plywood and 2inch x 4inch battens. Lay battens around perimeter at ½ inch from the wall, leave ¼ inch gap at each end. Position the first batten so its centre is 16 inches from the outside edge of the perimeter batten. Lay out the remaining battens across the area 16 inch intervals. Always check you battens are level using a level gauge you may need to use cedar shims to level out dips in the concrete, slide the shims under the battens until level. (If in doubt we recommend consulting a professional fitter for this method).

Wooden Subfloor

Hardwood floors can be nailed into existing wooden subfloors such as floorboards or plywood but not into chipboard floors as these are not strong enough to hold the nails. The floorboards must be in good condition and level if not it is advisable to lay 6mm exterior grade plywood down first.

To avoid creaking, check over the subfloor and securely fasten any loose floorboards. For added soundproofing it is also advisable to use a standard foam underlay.

When you nail down a solid wood floor you use a Porta Nailer to drive a nail at a 30 degree angle through the tongue and into the subfloor. Porta Nailers can be hired from any good hire shop but are expensive to buy.

Again you will need to leave a 15mm expansion gap around the perimeter of the room. To maintain this gap during installation spacers are provided in the installation kits.

After you have installed the floor you can cover this expansion gap with scotia or new skirting boards.The 15mm expansion gap also needs to be left in doorways where the floor follows through from one room to another; we sell full range of door profiles available to match your floor on this website.

WASTAGE

When ordering your new floor we recommend you allow for some wastage due to cuts a professional fitter would add on an extra 2%-5% of flooring needed to finish a job. We recommend non professional fitter should add on 5%-10%.

for futher information visit our website where you can also buy the wood flooring online at http://www.ukflooring4less.co.uk/




written by Mr David Kitto
http://www.ukflooring4less.co.uk/





This post was made using the Auto Blogging Software from WebMagnates.org This line will not appear when posts are made after activating the software to full version.

2011年12月14日 星期三

Concrete Testing Using Geotechnical Software


Concrete testing includes a variety of methods for testing concrete moisture, including both surface areas and the concrete within the depths of the slab. One commonly used method, though not covered in ICRI certification, is moisture meters which can be used for finding areas of higher surface moisture. This method, however, should not be used to obtain a quantitative value of the moisture or to indicate whether a slab is dry enough to start covering the floor, but mainly to show you where to begin. Once you've gotten a good reading, your geotechnical software can transmit the data directly through the lab, using a combination of mobile and online technology.

There are generally three moisture tests for concrete testing covered in ICRI certification. These include the calcium chloride test for moisture vapor emission rate of a slab, the surface relative humidity test, and the slab internal relative humidity test. It's essential that the building's environment remain consistent at least 48 hours prior to testing to allow the slab to reach a stable equilibrium with the ambient conditions of the building. The ideal temperature is right around what the plant emits during regular operation. This way the geotechnical software is fed more reliable data that can be transmitted back to the lab.

In concrete testing, the calcium chloride test measures the MVER of a slab, which essentially is the amount of H2O vapor emitting from the surface of the concrete. It's a popular test to determine if a floor is ready for floor coverings. Quite a few companies measure kits for this service, but it's best to use a testing kit that's compatible with geotechnical software so the data can be transferred instantly to the lab over the Internet. Unless of course, you'd like to relive 1985 and hit the payphone after lunchtime lugging a pocket full of quarters.

Each calcium chloride test is conducted using a small dish of dry bone calcium chloride that is then placed under a plastic dome to create a closed environment over the concrete. This is left on the surface for 60 to 72 hours. The CaCl then absorbs all moisture emitted from the concrete for accurate measurement. The MVER value can be expressed in the amount of water coming from the surface of 1000 square feet of area in 24 hours.

Once you've gotten accurate concrete testing data, the information is automatically cataloged by your geotechnical software and transferred electronically back to the lab. The concrete testing itself may be similar, but the transfer of data couldn't be simpler.




Saul Ellrod is the author of this article on geotechnical software and the process of concrete testing.





This post was made using the Auto Blogging Software from WebMagnates.org This line will not appear when posts are made after activating the software to full version.

2011年11月28日 星期一

8 Steps to Measure the Relative Humidity in Concrete According to the ASTM Standard


Practical advice for measuring humidity

The most common source of error when measuring relative humidity is a difference between the temperature of the probe and the temperature of the environment. At a humidity condition of 50 % RH, a temperature difference of 1 °C (1.8 °F) typically results in an error of 3 % RH on relative humidity.

It is good practice to monitor the display of the moisture meter for temperature stability. The probe should be given sufficient time to come to equilibrium with the environment to be measured. The larger the initial temperature difference between the probe and the environment, the more time is required for temperature equilibrium.

In extreme situations, condensation may occur on the sensors when the probe is colder than the environment. As long as the humidity / temperature limits of the humidity sensor are not exceeded, condensation does not alter the calibration of the sensor. However, the sensor has to dry out before it can provide a valid measurement.



Step 1: Check the correct functionality of the instrument and probe using the humidity standard tube.

Step 2: Concrete floor slab and air space surroundings must be at service temperature / humidity for at least 48 hours.

Step 3: Define numbers of test holes

Step 4: Define depth of test holes

Step 5: Drill and prepare test holes

Step 6: Wait 72 hours for moisture equilibrium

Step 7: Measure

o Insert in-situ probe into sleeve

o Wait for temperature equilibrium

o Check for stable values



Step 8: Report all necessary information




To find out more about Proceq's moisture meter visit us at http://www.proceq.com/en/non-destructive-test-equipment/concrete-testing/moisture-corrosion-analysis/hygropin.html?pqr=2
Proceq SA of Switzerland, founded in 1954, is the leading manufacturer of high quality portable test equipment for concrete properties, metal hardness and paper hardness applications. The company's strong research and development team continues to create products that set industry standards for portable test equipment.
The moisture meter Hygropin offers the perfect solution to identify and monitor moisture in concrete. Due to its small, fast sensor, diagnosing moisture according to the ASTM standard is quicker and easier than ever before.





This post was made using the Auto Blogging Software from WebMagnates.org This line will not appear when posts are made after activating the software to full version.